Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the loginizer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/cm2050/yorkwoods.atlantisdigital.ca/wp-includes/functions.php on line 6131
Finch West LRT Line/Transit Accessibility | Yorkwoods Condos
Finch West

Finch West LRT Line

$2.5 billion future Finch West LRT scheduled completion in 2023. Once built, it will have essential links to TTC Yonge and University Line, York and Peel Region local transit. This line will provide rapid transit to 46,000 passengers per weekday. Annual ridership estimate of 12 million passengers by 2031.

18 stops
18 stops
18 stops

Jane and Finch LRT stop will be 700m or 3 minutes walk to Yorkwoods Condos. Metrolinx’s ‘Finch West LRT Real Estate Market Conditions Study’ suggests that such demand for residential uses would likely be strongest within walking distance of LRT stops.

Finch LRT Line

Transit Accessibility

Jane/Finch Bus
Highway near Finch